“PRINCESS” ARRIVING STAVANGER WITH BARGE “AMT CRUSADER” LOADED WITH A WIND FARM CONSTRUCTION, 16 FEBRUARY 2023

“PRINCESS” passing Mekjarvik, 16 February 2023, on her way from Nigg UK to Stavanger, with the barge “AMT CRUSADER”, loaded with a wind farm construction. The barge was handed over to local tugs “BB CONNECTOR” and “BB WORKER”, and “PRINCESS” departed shortly after for Rotterdam. —   —   —   —   — “PRINCESS” / Antwerpen TYPE: AHTS … Continue reading “PRINCESS” ARRIVING STAVANGER WITH BARGE “AMT CRUSADER” LOADED WITH A WIND FARM CONSTRUCTION, 16 FEBRUARY 2023